Seven Sisters flats where the unit is fitted in one visit
Time is short. Ask for the vacuum stage not to be hurried.
Refrigerant-related work · Seven Sisters
After the pipework has been proved tight, the next step is to pull the air and moisture out of it with a vacuum pump. Air and damp left inside harm the system and its oil, and can cause faults years later. The step takes time, and it is tempting to hurry it. Residents in Seven Sisters having a unit fitted can ask about the vacuum stage and how it is checked.
Certified for the work. Heat Go holds Gas Safe, WaterSafe, G3 and heating and plumbing certification. Call +44 7551 336264 to talk it through.
Many flats in Seven Sisters have a short pipe run through a rear wall to a balcony or yard. The work is often fitted into a single visit, and there may be pressure on the fitter to finish. A rushed vacuum leaves moisture behind, which does not show until the unit has run for a while.
There are five points in the stage. The vacuum pump is connected to the pipes and the system, and started. A gauge shows the vacuum falling to a very low pressure, measured in a small unit that the engineer will name. The pump is then isolated, and the gauge is watched to see whether the vacuum holds or rises. A steady reading shows there is no leak and no moisture boiling off. Only then is the refrigerant released from the outdoor unit’s store or topped to the correct amount. Ask the engineer for the vacuum reading, the hold time and the result, and to write them in the record.
Heat Go can draft a few questions about the vacuum stage for the fitter if you tell it the type of unit and the length of the pipe run.
Time is short. Ask for the vacuum stage not to be hurried.
More pipe holds more air. Ask for a longer vacuum time.
Moisture is a risk. Ask the engineer how the pipes are protected before the test.
| Setting | Parking and van access | Property access | Typical enquiries |
|---|---|---|---|
| Seven Sisters flats where the unit is fitted in one visit | Roadside | Balcony | Single visits |
| Seven Sisters flats with a long pipe run through a hall | Permit zones | Hall | Long runs |
| Seven Sisters flats on a damp ground floor | Drives common | Ground floor | Damp sites |
Show the engineer the pipe route and the unit’s details. Tell him if the pipes have been exposed to rain or damp before the vacuum stage.
A tenant’s landlord has a new unit fitted in a flat, with the pipes run through the rear wall. The engineer connects a vacuum pump after the nitrogen test and shows the tenant the gauge falling to a low reading. He isolates the pump, waits, and shows the gauge holding steady. He writes the reading and the hold time on the record, and only then opens the valves to release the refrigerant. The tenant gets a copy of the record for refrigerant work, and the agent files another with the lease papers.
A fit in spring leaves time to do each stage properly. In a heatwave, the work is rushed because the unit is needed at once. Damp days are the worst for pipes left open, so cover the ends and choose a dry day for the vacuum.
A pump that draws air and moisture out of pipework and a system before it is filled.
The process of pulling a system down to a very low pressure to remove air and moisture.
Closed off from other parts of a system so that it can be watched on its own.
To remove air and moisture before the refrigerant goes in.
The gauge holds steady after the pump is isolated.
It should not be, so ask for the full time.
Ask for it in the record in refrigerant work work in Seven Sisters.
Ring 0800 111 999 before anything; while Seven Sisters refrigerant work is put aside, and Seven Sisters refrigerant work can restart later.
Talk to Heat Go
Tell Heat Go your pipe run and the unit type, and a short list of vacuum-stage questions for the fitter will be written.
The quickest way to talk to a Gas Safe, WaterSafe and G3 certified team is to call +44 7551 336264.
All air conditioning servicesEvery service in Seven SistersAll refrigerant-related work areas