Heat pump installation in Edgware: planning the switchover so the household is not left cold between old and new

A heat pump installation involves several trades and several days, and the household lives through it. Whether it is a smooth fortnight or a cold one depends on planning. The old boiler can stay in place until the new system is ready, if the work is sequenced well. The outdoor unit, the cylinder and the new radiators can be fitted first. Households in Edgware can ask the installer for a timetable that keeps the heating on.

Certified for the work. Heat Go holds Gas Safe, WaterSafe, G3 and heating and plumbing certification. Call +44 7551 336264 to talk it through.

Gas Safe Register WaterSafe Heat Go G3 certified Heat Go Heating and Plumbing Engineer

Houses and flats in Edgware range from compact homes to large family houses, each with its own routine. A switchover in the depths of winter is hard, and one in late summer is easier. The work includes siting the unit, running pipes, fitting a cylinder, changing radiators and wiring. Many of these steps need no heating shut-off until the final connection.

A well-planned installation has six stages. A survey and design, finished before any work begins. Ordering of equipment, with time for delivery. Early work that does not affect heating: the unit’s base, the electrical supply and the cylinder position. The fitting of new radiators, one room at a time. The final connection, when the old boiler is isolated and the heat pump started. And commissioning and handover, with the controls explained. Ask for each stage to be dated, and for the heating-off period to be stated.

Heat Go can help you draw up the timetable. Tell us what is being changed, and a staged plan with the heating-off period marked can be suggested.

Planning a heat pump switchover for an Edgware home

Switchover questions in different Edgware homes

Houses with young children

A cold house is hard. Ask for the final connection to be done on a mild day and for a heater to be provided or advised.

Households with someone at a desk all day

Noise and visits disrupt the day. Ask for the noisiest jobs to be put together on days when the house is empty.

Flats with only a single bath or shower room

Hot water is needed daily. Ask how long it will be off and how to manage.

SettingParking and van accessProperty accessTypical enquiries
Houses with young childrenRoadsideKitchenFamily routines
Households with someone at a desk all dayDrives commonStudyWorking days
Flats with only a single bath or shower roomPermit zonesBathroomHot water gaps

Say which days suit the household and how the routine runs. Ask them to put the plan in writing.

A household plans a heat pump for September. The installer fits the outdoor unit base, runs the electrical supply and positions the cylinder over the first week, with the old boiler still working. New radiators go in room by room. On the tenth day, he isolates the boiler, connects the pump and commissions it. The household is without heating for a day, on a mild afternoon. By evening, the new system is warm. The installer reminds the household that radiators will feel gently warm rather than hot, which is normal for a heat pump, and that the house will warm steadily over a day or two. The household sets the controls as advised and notes the time the heating comes on each morning. They also photograph the controller’s screen at handover, so that the settings can be restored if they are ever changed by mistake. After a week, the house is comfortable, and the old boiler, now disconnected, is collected by the installer, with the paperwork for its disposal.

A switchover in late summer or early autumn is gentlest, when the evenings are mild and the household will be glad of a warm house by winter.

Good to know in Edgware

Staged work

Installation divided into steps, so that heating is interrupted for as short a time as possible.

Final connection

The step at which the new system is joined to the old pipework and the old boiler isolated.

Commissioning

The tests and adjustments made when a new system is first started.

Questions about heat pump installation in Edgware

01Will I be without heating?

For a short time, at the final connection. Ask for it to be stated.

02Can the old boiler stay in place?

Often until the final connection.

03What about hot water?

Ask how long it will be off and what alternatives exist.

04When is the best time?

Late summer, when the evenings are mild.

05Should I have the plan in writing?

Yes, with each stage dated.

Talk to Heat Go

Ask about heat pump installation in Edgware.

Tell Heat Go how your household’s days run, with your Edgware street, and a staged plan can be suggested.

The quickest way to talk to a Gas Safe, WaterSafe and G3 certified team is to call +44 7551 336264.